NYC Clock · Local Law 152

LL152 due date lookup/Local Law 152 due dates for 2026

Local Law 152 due dates for 2026

Buildings in community districts 4, 6, 8, 9 and 16, in all five boroughs, must have their gas piping inspected by 31 December 2026. On DOB's covered-buildings list that is 68,620 buildings. This is Sub-cycle C, set by 1 RCNY §103-10(a)(4)(iii), and it is the deadline that is live right now.

Check a building

Paste a list of addresses or BBLs and get each building's community district, its sub-cycle, and the dates that lead up to its deadline, read from DOB's own covered-buildings list.

Open the due date lookup

If you are reading this late in 2026, read the sixty-day section first. The date you need is not only 31 December. It is 31 December minus however long your filing takes, and after about the start of November the filing window is the thing that binds, not the inspection.

The full four-year schedule

Community districts are the same in every borough. Building counts are from DOB's covered-buildings list, 279,810 rows dated 27 July 2026.
Sub-cycleCommunity districtsInspection yearsBuildings
A1, 3 and 102024, 2028, 203271,689
B2, 5, 7, 13 and 182025, 2029, 203377,475
C4, 6, 8, 9 and 162026, 2030, 203468,620
D11, 12, 14, 15 and 172027, 2031, 203562,026

Counts are ours, from an index over DOB's covered-buildings spreadsheet, 279,810 rows dated 27 July 2026. DOB publishes the list. It does not publish the totals.

Two deadlines, not one

Almost every page about Local Law 152 talks about a single deadline. There are two, they are triggered by different things, and missing them costs you different things.

The cycle deadline. Your building has to be inspected by 31 December of its year. §103-10(a)(4) sets the year by community district. §103-10(f) is the civil penalty for not having the certification in by that date: $1,500 for a 3-family building, $5,000 for everything else.

The sixty-day clock. Once the inspection happens, the owner has sixty days from the inspection date to file the certification. §103-10(d)(2). File on day sixty-one and the rule says the filing “will not satisfy the requirement of this paragraph” and “will require a new inspection”. Not a fine. A new inspection, paid for again.

The two interact badly at the end of the year. Sixty days from a 1 December inspection is the end of January, but the penalty under (f) has already attached on 31 December. So the practical window is whichever is shorter. Inspect on 1 December and you have thirty days to file, not sixty. Inspect on the 20th and you have eleven.

This is the single most common way a building that did everything right still ends up with a violation. The plumber came. The work got done. The paperwork sat on someone's desk over the holidays.

What a realistic November looks like

Work backwards. The certification has to be filed in DOB NOW by 31 December. Before that the licensed master plumber has to get you the inspection report and the signed certification, which the rule gives them up to thirty days to do, §103-10(d)(1). Before that the inspection has to happen. Before that the plumber has to notify DOB, at least two days ahead, §103-10(a)(6).

So an inspection booked for 15 December is not a 15 December problem. If the plumber takes the full thirty days on the paperwork you are filing in mid-January, past the penalty date. Most plumbers turn it round faster than that. You are relying on them to.

And if conditions requiring correction turn up, that is a separate clock again with its own deadline and its own filing.

Missed it

File anyway, and file now rather than waiting for the paperwork to find you. The penalty under §103-10(f) is $1,500 for a 3-family building and $5,000 for everything else. It does not grow with time, and filing late is better than not filing, because an unresolved violation needs both the payment and the certification before it clears.

DOB's own notice for the previous sub-cycle records Notices of Violation going out in January 2026 for a deadline that fell at the end of 2024. If you are late you probably have some months before anything arrives. Use them.

There are waiver grounds in §103-10(h), added in January 2026: new ownership, government ownership, bankruptcy, a state of emergency, conversion to or misclassification as R-3, a demolished building, a sealed or vacated building, no gas piping, no active gas service, and gas work already in progress. Challenges go in within 30 days of the violation date.

Questions people actually ask

Which community districts are due in 2026?

Community districts 4, 6, 8, 9 and 16 in all five boroughs. 1 RCNY §103-10(a)(4)(iii).

How many NYC buildings are due in 2026?

68,620, counted from DOB's covered-buildings list dated 27 July 2026.

What is the penalty for missing the 2026 deadline?

$1,500 for a 3-family building and $5,000 for all other buildings, under 1 RCNY §103-10(f). DOB's own guidance page still prints a flat $5,000 and does not mention the lower tier. The rule governs.

What is the last sensible date to book an inspection for 2026?

There is no rule on this. Practically, the plumber has up to thirty days to give you the paperwork and you need it filed by 31 December, so booking into December means depending on a fast turnaround. Earlier is safer, and there is no rule against inspecting early.

Does the deadline move if I file the certification in January?

No. The sixty-day clock in §103-10(d)(2) runs from the inspection date and can extend into the next year, but the civil penalty in §103-10(f) attaches at the cycle deadline regardless. A January filing satisfies (d)(2) and still draws the (f) penalty.

Sources

  1. 1 RCNY §103-10, Gas Piping System Periodic Inspections, NYC Department of Buildings. nyc.gov/assets/buildings/rules/1_RCNY_103-10.pdf
  2. Periodic Gas Piping System Inspections, DOB guidance page. nyc.gov, Periodic Gas Piping System Inspections
  3. LL152 Properties, DOB's covered-buildings spreadsheet, dated 27 July 2026. nyc.gov/assets/buildings/excel/LL152_Properties.xlsx
  4. DOB Service Notice Follow-up #8, 8 July 2026, on the move to DOB NOW. nyc.gov, Service Notice Follow-up #8
  5. Amendment of Rules Relating to Gas Piping Inspections, effective 3 January 2026. rules.cityofnewyork.us, January 2026 amendment

More on Local Law 152

Who made this

Our team at 02Launch.com builds AI into the workflows your managers already run. We made this page because DOB publishes the covered-buildings list as a spreadsheet, and matching a managed portfolio against it by hand is a day’s work.

What a 30 minute call with our AI engineers does for you:

  • Your portfolio out of your own system, not a paste. The lookup reads 250 lines at a time and forgets them when you close the tab. A build reads the buildings straight out of the system you already keep them in, so the list is never a stale copy and nobody re-keys it.
  • The filing window shrinks as the year runs out. The rule gives you sixty days after the inspection to file, and the year end caps it. Inspect on 1 December and you have thirty days, not sixty. Inspect on the 20th and you have eleven.
  • The rest of the calendar, not just this one. LL152 is one line. Facade, boiler and elevator cycles run on their own clocks in their own portals. The same build watches them and tells you when one moves.
Book a call with our team