NYC Clock · Local Law 152

LL152 due date lookup/Local Law 152 due dates for 2027

Local Law 152 due dates for 2027

Buildings in community districts 11, 12, 14, 15 and 17, in all five boroughs, must have their gas piping inspected by 31 December 2027. On DOB's own covered-buildings list that is 62,026 buildings. This is Sub-cycle D of the second four-year cycle, set by 1 RCNY §103-10(a)(4)(iv).

Check a building

Paste a list of addresses or BBLs and get each building's community district, its sub-cycle, and the dates that lead up to its deadline, read from DOB's own covered-buildings list.

Open the due date lookup

The catch-all nobody mentions

Sub-cycle D is not just those five districts. The rule reads: gas piping systems shall be inspected in “community districts 11, 12, 14, 15, and 17 and in any community district not specified in this paragraph in all boroughs”. §103-10(a)(4)(iv).

So if your district is not named in the 2024, 2025 or 2026 lanes, it falls here. An unlisted district is not an exempt district. Every competitor page we checked lists the five numbers and stops.

The full four-year schedule

Community districts are the same in every borough. Building counts are from DOB's covered-buildings list, 279,810 rows dated 27 July 2026.
Sub-cycleCommunity districtsInspection yearsBuildings
A1, 3 and 102024, 2028, 203271,689
B2, 5, 7, 13 and 182025, 2029, 203377,475
C4, 6, 8, 9 and 162026, 2030, 203468,620
D11, 12, 14, 15 and 172027, 2031, 203562,026

Counts are ours. We built an index over DOB's covered-buildings spreadsheet, 279,810 rows, and counted the buildings in each sub-cycle. DOB publishes the list but not the totals.

Two deadlines, not one

Almost every page about Local Law 152 talks about a single deadline. There are two, they are triggered by different things, and missing them costs you different things.

The cycle deadline. Your building has to be inspected by 31 December of its year. §103-10(a)(4) sets the year by community district. §103-10(f) is the civil penalty for not having the certification in by that date: $1,500 for a 3-family building, $5,000 for everything else.

The sixty-day clock. Once the inspection happens, the owner has sixty days from the inspection date to file the certification. §103-10(d)(2). File on day sixty-one and the rule says the filing “will not satisfy the requirement of this paragraph” and “will require a new inspection”. Not a fine. A new inspection, paid for again.

The two interact badly at the end of the year. Sixty days from a 1 December inspection is the end of January, but the penalty under (f) has already attached on 31 December. So the practical window is whichever is shorter. Inspect on 1 December and you have thirty days to file, not sixty. Inspect on the 20th and you have eleven.

This is the single most common way a building that did everything right still ends up with a violation. The plumber came. The work got done. The paperwork sat on someone's desk over the holidays.

You can inspect any time in the year

There is no rule against inspecting early. We looked, twice, through the full text of §103-10. Nothing restricts how early in the cycle year an inspection may be performed. No “not more than 60 days before”, no “no earlier than”, nothing.

Several vendor pages say otherwise. DOB's own schedule table contradicts them: it prints each sub-cycle as a full calendar year window, 1 January to 31 December. An inspection on 2 January 2027 is compliant.

Book early anyway. Not because the rule says so, but because sixty thousand buildings are chasing the same licensed master plumbers in the same twelve months, and the ones who leave it to November are the ones who discover the sixty-day clock the hard way.

What happens on 1 January 2028

Nothing automatic. DOB issues Notices of Violation in batches after a sub-cycle closes, not on the stroke of midnight. For Sub-cycle A, which closed at the end of 2024, DOB's own service notice records that violations went out in January 2026, roughly a year later.

That lag is not a grace period. The penalty attaches on the deadline. The paperwork arrives when it arrives, and it arrives with a 30-day window to challenge it or request a waiver, filed in DOB NOW.

Questions people actually ask

Which community districts are due in 2027?

Community districts 11, 12, 14, 15 and 17 in all five boroughs, plus any community district not named in the 2024, 2025 or 2026 sub-cycles. 1 RCNY §103-10(a)(4)(iv).

How many buildings are due in 2027?

62,026 buildings appear in Sub-cycle D on DOB's covered-buildings list dated 27 July 2026.

What is the exact deadline for 2027?

31 December 2027 for the inspection. The certification is due within sixty days of the inspection date under §103-10(d)(2), but the civil penalty under §103-10(f) attaches if nothing is filed by the cycle deadline, so treat 31 December 2027 as the filing date too.

Can I get an extension past 31 December 2027?

Yes. §103-10(d)(6) provides a 180-day extension on notification to DOB plus a $35 filing fee. DOB administers it as one per cycle and expects the request before the sub-cycle ends.

My building is in Manhattan CD 7. When am I due?

2025, and then 2029. District numbers repeat across boroughs, so Manhattan CD 7, Brooklyn CD 7 and Queens CD 7 are all Sub-cycle B. If you missed 2025, you are late now and should file rather than wait for 2029.

Sources

  1. 1 RCNY §103-10, Gas Piping System Periodic Inspections, NYC Department of Buildings. nyc.gov/assets/buildings/rules/1_RCNY_103-10.pdf
  2. Periodic Gas Piping System Inspections, DOB guidance page. nyc.gov, Periodic Gas Piping System Inspections
  3. LL152 Properties, DOB's covered-buildings spreadsheet, dated 27 July 2026. nyc.gov/assets/buildings/excel/LL152_Properties.xlsx
  4. DOB Service Notice Follow-up #8, 8 July 2026, on the move to DOB NOW. nyc.gov, Service Notice Follow-up #8

More on Local Law 152

Who made this

Our team at 02Launch.com builds AI into the workflows your managers already run. We made this page because DOB publishes the covered-buildings list as a spreadsheet, and matching a managed portfolio against it by hand is a day’s work.

What a 30 minute call with our AI engineers does for you:

  • Your portfolio out of your own system, not a paste. The lookup reads 250 lines at a time and forgets them when you close the tab. A build reads the buildings straight out of the system you already keep them in, so the list is never a stale copy and nobody re-keys it.
  • The filing window shrinks as the year runs out. The rule gives you sixty days after the inspection to file, and the year end caps it. Inspect on 1 December and you have thirty days, not sixty. Inspect on the 20th and you have eleven.
  • The rest of the calendar, not just this one. LL152 is one line. Facade, boiler and elevator cycles run on their own clocks in their own portals. The same build watches them and tells you when one moves.
Book a call with our team