LL152 due date lookup/Local Law 152 due dates for 2027
Buildings in community districts 11, 12, 14, 15 and 17, in all five boroughs, must have their gas piping inspected by 31 December 2027. On DOB's own covered-buildings list that is 62,026 buildings. This is Sub-cycle D of the second four-year cycle, set by 1 RCNY §103-10(a)(4)(iv).
Paste a list of addresses or BBLs and get each building's community district, its sub-cycle, and the dates that lead up to its deadline, read from DOB's own covered-buildings list.
Open the due date lookupSub-cycle D is not just those five districts. The rule reads: gas piping systems shall be inspected in “community districts 11, 12, 14, 15, and 17 and in any community district not specified in this paragraph in all boroughs”. §103-10(a)(4)(iv).
So if your district is not named in the 2024, 2025 or 2026 lanes, it falls here. An unlisted district is not an exempt district. Every competitor page we checked lists the five numbers and stops.
| Sub-cycle | Community districts | Inspection years | Buildings |
|---|---|---|---|
| A | 1, 3 and 10 | 2024, 2028, 2032 | 71,689 |
| B | 2, 5, 7, 13 and 18 | 2025, 2029, 2033 | 77,475 |
| C | 4, 6, 8, 9 and 16 | 2026, 2030, 2034 | 68,620 |
| D | 11, 12, 14, 15 and 17 | 2027, 2031, 2035 | 62,026 |
Counts are ours. We built an index over DOB's covered-buildings spreadsheet, 279,810 rows, and counted the buildings in each sub-cycle. DOB publishes the list but not the totals.
Almost every page about Local Law 152 talks about a single deadline. There are two, they are triggered by different things, and missing them costs you different things.
The cycle deadline. Your building has to be inspected by 31 December of its year. §103-10(a)(4) sets the year by community district. §103-10(f) is the civil penalty for not having the certification in by that date: $1,500 for a 3-family building, $5,000 for everything else.
The sixty-day clock. Once the inspection happens, the owner has sixty days from the inspection date to file the certification. §103-10(d)(2). File on day sixty-one and the rule says the filing “will not satisfy the requirement of this paragraph” and “will require a new inspection”. Not a fine. A new inspection, paid for again.
The two interact badly at the end of the year. Sixty days from a 1 December inspection is the end of January, but the penalty under (f) has already attached on 31 December. So the practical window is whichever is shorter. Inspect on 1 December and you have thirty days to file, not sixty. Inspect on the 20th and you have eleven.
This is the single most common way a building that did everything right still ends up with a violation. The plumber came. The work got done. The paperwork sat on someone's desk over the holidays.
There is no rule against inspecting early. We looked, twice, through the full text of §103-10. Nothing restricts how early in the cycle year an inspection may be performed. No “not more than 60 days before”, no “no earlier than”, nothing.
Several vendor pages say otherwise. DOB's own schedule table contradicts them: it prints each sub-cycle as a full calendar year window, 1 January to 31 December. An inspection on 2 January 2027 is compliant.
Book early anyway. Not because the rule says so, but because sixty thousand buildings are chasing the same licensed master plumbers in the same twelve months, and the ones who leave it to November are the ones who discover the sixty-day clock the hard way.
Nothing automatic. DOB issues Notices of Violation in batches after a sub-cycle closes, not on the stroke of midnight. For Sub-cycle A, which closed at the end of 2024, DOB's own service notice records that violations went out in January 2026, roughly a year later.
That lag is not a grace period. The penalty attaches on the deadline. The paperwork arrives when it arrives, and it arrives with a 30-day window to challenge it or request a waiver, filed in DOB NOW.
Community districts 11, 12, 14, 15 and 17 in all five boroughs, plus any community district not named in the 2024, 2025 or 2026 sub-cycles. 1 RCNY §103-10(a)(4)(iv).
62,026 buildings appear in Sub-cycle D on DOB's covered-buildings list dated 27 July 2026.
31 December 2027 for the inspection. The certification is due within sixty days of the inspection date under §103-10(d)(2), but the civil penalty under §103-10(f) attaches if nothing is filed by the cycle deadline, so treat 31 December 2027 as the filing date too.
Yes. §103-10(d)(6) provides a 180-day extension on notification to DOB plus a $35 filing fee. DOB administers it as one per cycle and expects the request before the sub-cycle ends.
2025, and then 2029. District numbers repeat across boroughs, so Manhattan CD 7, Brooklyn CD 7 and Queens CD 7 are all Sub-cycle B. If you missed 2025, you are late now and should file rather than wait for 2029.